சனி, 2 ஏப்ரல், 2016

DA 2016

Add caption

 

Expected DA July 2016 – AICPIN For February 2016



                              

No.5/1/2016- CPI
GOVERNMENT OF INDIA
MINISTRY OF LABOUR & EMPLOYMENT
LABOUR BUREAU

`CLEREMONT’, SHIMLA-171004
DATED: 31st March,2016

Press Release


Consumer Price Index for Industrial Workers (CPI-IW) – February, 2016

The All-India CPI-IW for February, 2016 decreased by 2 points and pegged at 267 (two hundred and sixty seven). On 1-month percentage change, it decreased by (-) 0.74 per cent between January, 2016 and February, 2016 when compared with the decrease of (-) 0.39 per cent between the same two months a year ago.

The maximum downward pressure to the change in current index came from Food group contributing, (-) 2.21 percentage points to the total change. At item level, Rice, Arhar Dal. Masur Dal, Moong Dal, Urd Dal, Groundnut Oil, Mustard Oil, Poultry (Chicken), Eggs (Hen), Garlic, Onion, Vegetable and Fruit items, Flower/Flower Garlands, etc. are responsible for the decrease in index. However, this decrease was checked by Wheat and Wheat Atta, Fish Fresh, Goat Meat, Milk, Tea (Readymade), Sugar, Cigarette, Tailoring Charges, etc., putting upward pressure on the index.

The year-on-year inflation measured by monthly CPI-IW stood at 5.53 per cent tbr February, 2016 as compared to 5.91 per cent for the previous month and 6.30 per cent during the corresponding month of the previous year. Similarly, the Food inflation stood at 6.18 per cent against 7.61 per cent of the previous month and 7.42 per cent during the corresponding month of the previous year.

At centre level, Giridih reported the maximum decrease of 8 points followed by Madurai, Tiruchirapally, Munger-Jamalpur and Bengaluru (7 points each) and Sholapur. Mundakkayam and Belgaum (6 points each). Among others. 5 points decrease was observed in 3 centres, 4 points in 8 centres, 3 points in another 8 centres. 2 points in 14 centres and 1 point in 10 centres. On the contrary, Quilon recorded a maximum increase of 5 points followed by Mysore and Rajkot (3 points each) and Kodarma (2 points). Among others, 1 point increase was observed in 9 centres. Rest or the 14 centres’ indices remained stationary.

The indices of 34 centres are above All-India Index and other 44 centres’ indices are below national average.

The next issue of CPI-IW for the month of March, 2016 will be released on Friday, 29th April, 2016. The same will also be available on the office website wvvvv. /labourbureaunew.gov.in.

(SHYAM SINGH NEGI)
DEPUTY DIRECTOR GENERAL


Authority: www.labourbureau.nic.in

வெள்ளி, 1 ஏப்ரல், 2016

Pay Commission Latest News

Pay Commission Latest News – Don’t think 7th CPC Suggestions will Remain – Parrikar

7thcpc-OROP-Parrikar

“The seventh Pay Commission is in the form of recommendations. I do not think they (recommendations) will remain. I do not consider them as finalities. I have flagged them and will flag them properly at the right level,” said the defence minister.

7th Pay Commission Latest News – Don’t think 7th CPC Suggestions will Remain – “I will not claim that I have turned it around completely but at least something has been done so that deliveries can start. Ground has been prepared. Delivery is now the key word,” said Parrikar.


Defence Minister Manohar Parrikar on Tuesday said the recommendation of 7th Pay Commission was not final and he would take up concerns raised by the Armed Forces at the right level.

In an exclusive interview with the India Today, Parrikar said he has prepared ground for smoothening the defence procurement which needed to be backed by deliveries now.

On the concerns raised by the Armed Forces over the raw deal given to them in the 7th Pay Commission, Parrikar said it was not the final word. “The seventh Pay Commission is in the form of recommendations. I do not think they (recommendations) will remain. I do not consider them as finalities. I have flagged them and will flag them properly at the right level,” said the defence minister.

Parrikar, who inaugurated arms show DefExpo in Goa on Monday where a strong pitch is being made to further expand the growing defence sector, said negative environment surrounding the military acquisitions has changed.

“I will not claim that I have turned it around completely but at least something has been done so that deliveries can start. Ground has been prepared. Delivery is now the key word,” said Parrikar adding that there was an environment of mistrust, suspicion which can be frustrating in dealing with forces.

He said the industry cannot be held responsible for responding slowly to the changing atmosphere. “They have experienced a congested atmosphere and the breeze has only now begun flowing in. However, it cannot happen overnight. Confidence building measures are in place. Industry has begun responding,” he said outlining how smaller changes have been made.

“Offsets have taken off, exports are improving, procurement from local level has gone up. At the capital procurement level, it has not taken off or turned into a big deal because it takes longer. Industry has definitely responded.” Talking about the defence reforms like the appointment of a Chief of Defence Staff, Parrikar said there are no hurdles in bringing defence reforms. “There has to be a rational decision. Drafts are being prepared and shared. Very soon it will be brought to the Cabinet,” he said.

Asked about delay in development of critical equipment like Intermediate Jet Trainers (IJT) for the IAF or submarines for the navy, Parrikar said the air force does not think the IJT is a requirement as it is training on simulators, Basic Trainer Aircraft and Advanced Jet Trainer. “Instead of three, it is a two-level, re-caliberated approach. The proposal for six under-construction Scorpene submarines is moving smoothly. Next project P75, I will tag along with our policy document on Strategic Partnership,” Parrikar said.

“When it will come about? Very soon, but I am not willing to issue a timeline. As far as Arihant, the issue should not be discussed. We are equally concerned and are moving in the right direction,” he said. The three services raised a number of issues, but when the pay commission sought the defence ministry’s comments and recommendation, the ministry negated most of the demands of the services, the officer said.

Source: India Today

Maruti CSD Car April month Price List - Ajmer 2021

  Maruti CSD Car Price List April 2021 – Ajmer City Name                                   Description                                 Type ...